Build a supplier operating-time timeline
Put supplier-confirmed equipment periods, site access windows and programme markers on one dated chart. The builder sorts your entries and keeps unresolved information beside them, so you can ask the right supplier or venue contact about a particular time.
Use the venue’s local dates and times throughout, including the next day when an interval crosses midnight. No time-zone conversion takes place. Choose an honest status for every entry; a provisional time remains provisional in the printed report.
This is a scheduling comparison for review. It does not calculate power, generator size, fuel use or suitability. Access comparisons raise questions only: an operating period outside an entered window may need a different access arrangement, and a period inside it does not establish permission.
Inputs stay in this page while it is open. Nothing is sent or saved. Print a copy before refreshing if you need to retain your work; use equipment references and supplier roles rather than private contact details.
Enter the schedule
Use separate rows for separate periods. Access rows describe the windows you want compared, with the scope in the description. A programme marker needs a start time only. Blank dates remain unanswered.
The interactive builder needs JavaScript. A paper worksheet is available below when scripts are unavailable.
Discuss the actual generator arrangement with Fables. Keep this report with the supplier requirements and the matching site plan when requesting review.